---
title: POTS Replacement Solutions | Prepare for FCC Copper Shutdown | EPIC iO
description: Prepare your business for the FCC's copper shutdown. Discover POTS replacement solutions and complimentary tech support to ensure your critical systems remain operational.
image: https://pages.epicio.com/hubfs/PCN_Thumbnail-3.png
---

[![EPIC iO Logo](https://pages.epicio.com/hs-fs/hubfs/EPIC%20iO%20Logo%20-%20Color%20Horizontal.png?width=3508&height=1439&name=EPIC%20iO%20Logo%20-%20Color%20Horizontal.png "EPIC iO Logo")](http://www.epicio.com?hsLang=en)

![POTS-Header-4](https://pages.epicio.com/hs-fs/hubfs/POTS-Header-4.jpg?width=1200&name=POTS-Header-4.jpg "POTS-Header-4")

## The 90-Day Dash: POTS Replacement for Smart Businesses

### What the FCC’s copper shutdown means for your critical systems, and what to do before the notice arrives.

Legacy analog phone lines are being retired faster than most organizations realize. With FCC rule changes accelerating copper shutdown timelines, businesses relying on POTS for elevators, fire alarms, security systems, and emergency lines may have as little as **90 days’ notice** before disconnection.

This ebook helps you get ahead of the disruption.

![POTS\_ebook](https://pages.epicio.com/hs-fs/hubfs/POTS_ebook.png?width=300&height=301&name=POTS_ebook.png "POTS_ebook")

[Download the E-book](https://pages.epicio.com/hubfs/Advisor%20Channel/EPIC%20iO%20POTS%20Ebook.pdf?hsLang=en)

[Co-brand the Ebook](https://resources.epicio.com/s/4zhs4j6625rzmt5bn88x3hff)

![Icons\_Clock](https://pages.epicio.com/hs-fs/hubfs/Icons_Clock.png?width=100&height=100&name=Icons_Clock.png)

#### POTS Promotion – 3 Hours Free On-Site Tech Time, Per Location.

#### We're excited to offer your customers up to three hours of on-site tech time at no cost, included with each installation. Available for deployments of 100 locations or fewer. For larger opportunities (over 100 locations), approval will be handled on and Individual Case Basis (ICB).

OFFER DETAILS  
Requires a 36 month contract

Single-line sites:   
May not qualify and are subject to a $200 activation fee  (tech time waivers reviewed case-by-case)

Multi-line sites:   
$50 activation fee per line (waivers available)  
 Additional charges may apply for extended travel or excess time on site

Promo expires December 31, 2026

---

## Resource Library

### POTS Replacement

Dependable POTS Line replacement connectivity for critical applications

Highlights 

**FEATURED TECHNOLOGY**

---

24-hour batter backup

Standard and dual SIM failover options for backup

Remote monitoring

Rapid deployment and installation

![Screenshot 2025-03-18 at 4.34.15 PM](https://pages.epicio.com/hs-fs/hubfs/Screenshot%202025-03-18%20at%204.34.15%20PM.png?width=748&height=969&name=Screenshot%202025-03-18%20at%204.34.15%20PM.png)

##### Why EPIC  iO

[View Brief](https://pages.epicio.com/hubfs/Who%20is%20EPIC%20(16).pdf?hsLang=en)

![Screenshot 2025-03-18 at 4.33.33 PM](https://pages.epicio.com/hubfs/Screenshot%202025-03-18%20at%204.33.33%20PM.png)

##### **POTS Replacement**

[View Brief](https://pages.epicio.com/hubfs/LTE%20POTS%20Replacement%20(15).pdf?hsLang=en)

![ChannelMap0126](https://pages.epicio.com/hubfs/ChannelMap0126.jpg "ChannelMap0126")

Copyright © EPIC iO 2026. All Rights Reserved.